Program Specifications 项目规格 class: yl/sv/000

Services

服务

Yueqian Labs operates through bounded program engagements. Each engagement follows defined scope, constraint surfaces, and evaluation criteria. No open-ended retainers. No undefined deliverables.

月前实验室通过有界项目运作。每个项目遵循明确的范围、约束面和评估标准。无开放式委托。无未定义交付物。

lab note: yl/sv/index/001
code: yl-sv-edge-001 type: deployment program status: accepting intake

Edge Deployment Program

边缘部署项目

Scope 范围

Deploy inference systems to constrained hardware targets. Thermal profiling, latency budgeting, offline validation.

Constraint Surface 约束面

Hardware thermal limits, power budgets, network availability.

Deliverables 交付物

Deployment pipeline, thermal profile report, validation harness.

Evaluation Criteria 评估标准

Latency within budget, thermal compliance, offline capability verified.

Phase Sequence 阶段序列
phase-01

Assessment

评估

phase-02

Constraint mapping

约束映射

phase-03

Pipeline build

管道构建

phase-04

Validation

验证

phase-05

Handover

移交

Reference Engagement

Deployed offline inference pipeline to RISC-V SoC cluster for a healthcare diagnostics firm. Achieved 340ms p99 latency under 4.8W thermal ceiling. System operates fully airgapped with no external network dependency.

为医疗诊断公司在RISC-V SoC集群上部署离线推断管道。在4.8W热上限下实现340ms p99延迟。

lab note: yl/sv/edge/001
code: yl-sv-local-001 type: integration program status: accepting intake

Local Compute Integration

本地计算集成

Scope 范围

Establish airgapped or local-first inference environments. Secure runtime setup, retrieval integration, fine-tuning under constraints.

Constraint Surface 约束面

Data sovereignty requirements, network isolation, compute budget.

Deliverables 交付物

Runtime environment, retrieval system, constraint documentation.

Evaluation Criteria 评估标准

Airgap verification, retrieval accuracy, runtime stability.

Phase Sequence 阶段序列
phase-01

Requirements audit

需求审计

phase-02

Isolation architecture

隔离架构

phase-03

Runtime provisioning

运行时配置

phase-04

Retrieval integration

检索集成

phase-05

Verification and handover

验证与移交

lab note: yl/sv/local/001
code: yl-sv-verify-001 type: design program status: accepting intake

Verification Framework Design

验证框架设计

Scope 范围

Design and implement evaluation harnesses for inference systems. Behavioral testing, constraint verification, regression tracking.

Constraint Surface 约束面

Behavioral specifications, accuracy thresholds, latency bounds.

Deliverables 交付物

Evaluation harness, test suite, regression baseline.

Evaluation Criteria 评估标准

Coverage metrics, false positive rate, maintenance burden.

Phase Sequence 阶段序列
phase-01

Behavioral specification

行为规格定义

phase-02

Harness architecture

框架架构

phase-03

Test suite build

测试套件构建

phase-04

Regression baseline

回归基线

phase-05

Handover and documentation

移交与文档

lab note: yl/sv/verify/001
code: yl-sv-quantum-001 type: consultation program status: limited intake

Quantum Workflow Consultation

量子工作流咨询

Scope 范围

Assess feasibility and design bounded quantum-classical hybrid workflows. Sampling integration, decoherence budgeting.

Constraint Surface 约束面

Qubit availability, decoherence windows, classical fallback requirements.

Deliverables 交付物

Feasibility report, workflow specification, integration pathway.

Evaluation Criteria 评估标准

Sampling accuracy, decoherence compliance, classical parity.

Phase Sequence 阶段序列
phase-01

Feasibility assessment

可行性评估

phase-02

Decoherence budgeting

退相干预算

phase-03

Workflow specification

工作流规格

phase-04

Integration pathway

集成路径

phase-05

Report delivery

报告交付

lab note: yl/sv/quantum/001
code: yl-sv-audit-001 type: audit program status: waitlist (Q2 2025)

Institutional AI Audit

机构AI审计

Scope 范围

Systematic review of existing AI deployments against defined constraint surfaces. Governance gap analysis, risk boundary mapping.

Constraint Surface 约束面

Regulatory requirements, organizational risk tolerance, operational constraints.

Deliverables 交付物

Audit report, gap analysis, remediation roadmap.

Evaluation Criteria 评估标准

Coverage completeness, actionable findings, implementation feasibility.

Phase Sequence 阶段序列
phase-01

Scope definition

范围定义

phase-02

Deployment inventory

部署清单

phase-03

Constraint surface analysis

约束面分析

phase-04

Gap identification

差距识别

phase-05

Report and remediation

报告与修复路径

lab note: yl/sv/audit/001
Evaluation Doctrine 评估准则 class: yl/sv/eval/001

Every program ships with its evaluation harness. Deliverables are verified against defined constraint surfaces before handover. No work is considered complete until the verification budget is exhausted.

每个项目都附带其评估框架。交付物在移交前须经过定义约束面的验证。验证预算未耗尽前,工作不视为完成。

lab note: yl/sv/eval/002
Engagement Protocol 参与协议 class: yl/sv/proto/001
step-01

Initial contact through controlled intake

通过受控入口发起联系

step-02

Preliminary scope assessment (5 business days)

初步范围评估(5个工作日)

step-03

Constraint surface definition (collaborative)

约束面定义(协作进行)

step-04

Program specification document (mutual sign-off)

项目规格文件(双方签署)

step-05

Execution under defined bounds

在定义边界内执行

step-06

Verification and handover

验证与移交

initiate intake →
lab note: yl/sv/proto/002